

Komatsu iMC Excavator Video
Komatsu 128i Semi-Automated GPS system video


Site Control - Principle 2
One control point 0.1' out of tolerance on the wrong side of a project cost a contractor a full site rebuild. The fix was simple and completely avoidable. Principle 2 covers how to distribute GPS control points so your machine control system can actually catch errors before your crew finishes grade.


Site Control - Principle 1
Your machine control model is only as good as your site control. Get that wrong and it doesn't matter how accurate the 3D file is, your equipment is working off a bad reference. Principle 1 is straightforward: hire the engineering firm that designed the project to place your control. Not the low bidder. Not your brother-in-law. The design engineer's surveyor is the only one with all the information and the authority to fix it when something is off.


Get Your 3D Grading Under Control
Poor site control is one of the most common (and avoidable) problems encountered by Quantum's clients. Improper site control leads to a


Bogged Down by a Wet Site? Use Machine Control For Drainage Solutions to Keep Your Project Moving
Learn how construction drainage machine control models keep your site dry and projects on schedule.


Integrating Machine Control with UAV Aerial Data Acquisition
Explore how UAV aerial data and 3D machine control are transforming heavy civil construction with Quantum Land Design & AeroView Services.


















