

GPS Site Control - Keep it Level
It seems simple but, too often, machine control basics like keeping the rover level and stable are overlooked when calibrating GPS to a cons

Zach Pieper


Case CE Factory Fit Leica Machine Control
Case Construction is now offering Leica 3D and 2D machine control right from the factory.

Quantum Land Design


Caterpillar Operator Stadium - Conexpo 2020
Quantum Land Design played a hidden, but big part in Caterpillar's Operator Stadium demos at Conexpo/Con-Agg 2020.

Quantum Land Design


Ground Control - Principle 4
Ground control points put your drone data in the right location. Check shots are what prove it's actually accurate. Collect them between GCPs, at tie-ins and flowlines, and any critical elevation areas. Any check shot is better than none, and they add almost no time to your field work.

Zach Pieper


Ground Control - Principle 5
ALWAYS, and only, measure in your ground control with a rover that is fully calibrated to the site control for your GPS system.

Zach Pieper


Komatsu PC490LCi Underwater Wall Grinding
This Komatsu Construction 490LCi is grinding a wall, underwater, in a barge lock.

Quantum Land Design


Ground Control - Principle 3
To start, place a GCP on roughly the highest and lowest spots on your project. Don't worry about...

Zach Pieper


Ground Control - Principle 2
Surrounding your site with ground control is the step that does most of the heavy lifting. Four to six GCPs placed near the outer boundary will box in your drone data and lock it to your machine control model. Here's how to lay them out for any site shape, road, or levee.

Zach Pieper
















