Quantum's YouTube Pro Series Continues to Grow
It's important to us that our clients are successful with their machine control systems. We regularly add new content...

Quantum Land Design


Pro Series - John Deere 470G SmartGrade Excavator - Virtual Warnings
Learn how to quickly set up and use a virtual limit warning to avoid swinging into traffic or other obstacles.

Quantum Land Design


Pro Series - John Deere 470G SmartGrade Excavator - Key Settings
One of John Deere's Precision Construction Instructors, walks us through important settings on a 470G SmartGrade Excavator.

Quantum Land Design


Pro Series - John Deere 470G SmartGrade Excavator - Automatic Control
One of Deere's Precision Construction Instructors teaches us how to initiate automatic control on a 470G SmartGrade excavator.

Quantum Land Design


Pro Series - John Deere 750L SmartGrade - 2D Basics
One of John Deere's Precision Construction Instructors walks us through the basic functionality of the 2D Smart Grade system.

Quantum Land Design


Pro-Level GPS Machine Control Tips Every Contractor Should Know
Every contractor hits the same GPS machine control growing pains. We pulled tips from Caterpillar, John Deere, Komatsu, and Case -- four things their experts say consistently separate crews that make GPS work from those that don't.

Zach Pieper


GPS Site Control - Keep it Level
It seems simple but, too often, machine control basics like keeping the rover level and stable are overlooked when calibrating GPS to a cons

Zach Pieper


Ground Control - Principle 4
Ground control points put your drone data in the right location. Check shots are what prove it's actually accurate. Collect them between GCPs, at tie-ins and flowlines, and any critical elevation areas. Any check shot is better than none, and they add almost no time to your field work.

Zach Pieper


Ground Control - Principle 5
ALWAYS, and only, measure in your ground control with a rover that is fully calibrated to the site control for your GPS system.

Zach Pieper


Ground Control - Principle 3
To start, place a GCP on roughly the highest and lowest spots on your project. Don't worry about...

Zach Pieper