Pro Series - John Deere 470G SmartGrade Excavator - Virtual Warnings
Learn how to quickly set up and use a virtual limit warning to avoid swinging into traffic or other obstacles.


Pro Series - John Deere 470G SmartGrade Excavator - Key Settings
One of John Deere's Precision Construction Instructors, walks us through important settings on a 470G SmartGrade Excavator.


Pro Series - John Deere 470G SmartGrade Excavator - Automatic Control
One of Deere's Precision Construction Instructors teaches us how to initiate automatic control on a 470G SmartGrade excavator.


Pro Series - John Deere 750L SmartGrade - 2D Basics
One of John Deere's Precision Construction Instructors walks us through the basic functionality of the 2D Smart Grade system.


Pro-Level GPS Machine Control Tips Every Contractor Should Know
Every contractor hits growing pains with GPS machine control, but the fix doesn’t have to be complicated. We gathered field-tested advice from experts at Caterpillar, John Deere, Komatsu, and Case to highlight four simple but critical steps: learn the basics, invest in training, use high-quality 3D data, and appoint an internal GPS Champion. Nail these, and GPS becomes the backbone of your grading operation—not a source of frustration.


GPS Site Control - Keep it Level
It seems simple but, too often, machine control basics like keeping the rover level and stable are overlooked when calibrating GPS to a cons


Ground Control - Principle 4
Another important consideration when laying out your ground control is topo check shots.


Ground Control - Principle 5
ALWAYS, and only, measure in your ground control with a rover that is fully calibrated to the site control for your GPS system.


Ground Control - Principle 3
To start, place a GCP on roughly the highest and lowest spots on your project. Don't worry about...


Ground Control - Principle 2
Surrounding the site with ground control is a simple, but often overlooked, step. Usually four to six GCP's...